Category:Detail 360.01

From Delaware DOT Bridge Design Manual
Jump to navigation Jump to search

PRECAST CONCRETE RIGID FRAME DETAILS

Changelog

2022

  • Sheet 1 of 3
    • Added stone around all wingwall corners and extended down slope to CBF.
    • Updated guardail and barrier to current standards, added barrier reference to 325.02.
    • Added bottom of structural foundation notation.
    • Differentiated geotextile, riprap and geotextile, stabilization.
    • Added reference to Designer Note 13.
  • Sheet 3 of 3
    • Edited Designer Notes and 5 and 13.

Media in category "Detail 360.01"

The following 2 files are in this category, out of 2 total.