300 - Typical Bridge Design Detail: Difference between revisions
Jump to navigation
Jump to search
(Created page with "{| class="wikitable" |+ !Subject !Detail No. !Title !Issue Date |- |GENERAL |301.01 |BRIDGE PROJECT NOTES |04/01/2021 |- | |301.02 |REINFORCEMENT BAR FABRICATION DETAILS |04/0...") |
mNo edit summary |
||
Line 1: | Line 1: | ||
==== Detail No. 300.1 - Index of Typical Bridge Design Details ==== | |||
{| class="wikitable" | {| class="wikitable" | ||
|+ | |+ | ||
Line 51: | Line 52: | ||
|04/01/2021 | |04/01/2021 | ||
|} | |} | ||
DISCLAIMER: | |||
ALL TYPICAL BRIDGE DESIGN DETAILS SHOWN IN SECTION 300 OF THE BRIDGE DESIGN MANUAL ARE NOT INTENDED TO ACT AS STANDARD CONSTRUCTION DETAILS, AND THEREFORE MUST BE SHOWN ON BRIDGE PLANS IN THE CONTRACT DOCUMENTS. IN ADDITION, BRIDGE PLANS SHOULD NOT REFER TO SECTION 300 OF THE BRIDGE DESIGN MANUAL | |||
NOTE: | |||
THE DETAILS ON THIS SHEET HAVING 'N/A' UNDER ITS DATE ARE NOT YET AVAILABLE AND WILL BE INCLUDED IN FUTURE BRIDGE DESIGN MANUAL REVISIONS. |
Revision as of 10:21, 14 October 2021
Detail No. 300.1 - Index of Typical Bridge Design Details
Subject | Detail No. | Title | Issue Date |
---|---|---|---|
GENERAL | 301.01 | BRIDGE PROJECT NOTES | 04/01/2021 |
301.02 | REINFORCEMENT BAR FABRICATION DETAILS | 04/01/2021 | |
301.03 | CONCRETE REPAIR DETAILS | 01/31/2019 | |
301.04 | EXCAVATION AND BACKFILL PAY LIMIT DETAILS | 10/01/2016 | |
Substructure | 305.01 | PRESTRESSED-PRECAST CONCRETE PILE DETAILS | 04/01/2021 |
305.02 | CAST-IN-PLACE PILE DETAILS | 04/01/2021 | |
305.03 | STEEL H-PILE DETAILS | 04/01/2021 | |
305.04 | DRILLED SHAFT DETAILS | 04/01/2021 |
DISCLAIMER:
ALL TYPICAL BRIDGE DESIGN DETAILS SHOWN IN SECTION 300 OF THE BRIDGE DESIGN MANUAL ARE NOT INTENDED TO ACT AS STANDARD CONSTRUCTION DETAILS, AND THEREFORE MUST BE SHOWN ON BRIDGE PLANS IN THE CONTRACT DOCUMENTS. IN ADDITION, BRIDGE PLANS SHOULD NOT REFER TO SECTION 300 OF THE BRIDGE DESIGN MANUAL
NOTE:
THE DETAILS ON THIS SHEET HAVING 'N/A' UNDER ITS DATE ARE NOT YET AVAILABLE AND WILL BE INCLUDED IN FUTURE BRIDGE DESIGN MANUAL REVISIONS.