Typical Bridge Design details shown in Section 300 of the ''Bridge Design Manual'' are not intended to act as ''Standard Construction Details'', and therefore must be shown on bridge plans in the contract documents. In addition, bridge plans should not refer to Section 300 of the ''Bridge Design Manual''.
 
[[Media:Section 300.pdf|'''<big>Download all of Section 300 (PDF)</big>''']]
 
Subsection PDFs can be downloaded by clicking on the Detail No. below.
 
===INDEX OF TYPICAL BRIDGE DESIGN DETAILS===


==== Detail No. 300.1 - Index of Typical Bridge Design Details ====
{| class="wikitable"
{| class="wikitable"
|+
! Subject
!Subject
!Detail No.
!Detail No.
!DGN
!Title
!Title
!Issue Date
!Issue Date  
|-
|-
|GENERAL
| rowspan="4" |GENERAL
|[[Media:Bdm 2021 301 01.pdf|301.01]]
|[[Media:Detail 301.01.pdf|301.01]]
|BRIDGE PROJECT NOTES
|[[Media:Detail 301.01.dgn|DGN]]
|04/01/2021
|BRIDGE PROJECT NOTES  
|2022
|-
|-
|
|[[Media:Detail 301.02.pdf|301.02]]
|[[Media:Bdm 2021 301 02 PDF.pdf|301.02]]
|[[Media:Detail 301.02.dgn|DGN]]
|REINFORCEMENT BAR FABRICATION DETAILS
|REINFORCEMENT BAR FABRICATION DETAILS
|04/01/2021
|2022
|-
|-
|
|[[Media:Detail 301.03.pdf|301.03]]
|[[Media:Bdm 2021 301 03 PDF.pdf|301.03]]
|[[Media:Detail 301.03.dgn|DGN]]
|CONCRETE REPAIR DETAILS
|CONCRETE REPAIR DETAILS
|01/31/2019
|2022
|-
|-
|
|[[Media:Detail 301.04.pdf|301.04]]
|[[Media:Bdm 2021 301 04 PDF.pdf|301.04]]
|[[Media:Detail 301.04.dgn|DGN]]
|EXCAVATION AND BACKFILL PAY LIMIT DETAILS
|EXCAVATION AND BACKFILL PAY LIMIT DETAILS
|10/01/2016
|2022
|-
|-
|
| rowspan="8" | SUBSTRUCTURE
|
|[[Media:Detail 305.01.pdf|305.01]]
|
|[[Media:Detail 305.01.dgn|DGN]]
|
|PRESTRESSED-PRECAST CONCRETE PILE DETAILS
|2022
|-
|-
|Substructure
|[[Media:Detail 305.02.pdf|305.02]]
|[[Media:Bdm 2021 305 01 PDF.pdf|305.01]]
|[[Media:Detail 305.02.dgn|DGN]]
|PRESTRESSED-PRECAST CONCRETE PILE DETAILS
|CAST-IN-PLACE PILE DETAILS  
|04/01/2021
|2022
|-
|-
|
|[[Media:Detail 305.03.pdf|305.03]]
|305.02
|[[Media:Detail 305.03.dgn|DGN]]
|CAST-IN-PLACE PILE DETAILS
|04/01/2021
|-
|
|305.03
|STEEL H-PILE DETAILS
|STEEL H-PILE DETAILS
|04/01/2021
|2022
|-
|-
|
|[[Media:Detail 305.04.pdf|305.04]]
|305.04
|[[Media:Detail 305.04.dgn|DGN]]
|DRILLED SHAFT DETAILS
|DRILLED SHAFT DETAILS
|04/01/2021
|2022
|-
|-
|
|[[Media:Detail 310.01.pdf|310.01]]
|310.01
|[[Media:Detail 310.01.dgn|DGN]]
|REINFORCED CONCRETE CANTILEVER ABUTMENT DETAILS
|CANTILEVER ABUTMENT DETAILS
|N/A
|2022 (new)
|-
|-
|
|[[Media:Detail 310.02.pdf|310.02]]
|310.02
|[[Media:Detail 310.02.dgn|DGN]]
| STUB ABUTMENT DETAILS
|STUB ABUTMENT DETAILS
|N/A
|2022 (new)
|-
|-
|
|[[Media:Detail 315.01.pdf|315.01]]
|310.03
|[[Media:Detail 315.01.dgn|DGN]]
|SEMI-INTEGRAL ABUTMENT DETAIL
|N/A
|-
|
|310.04
|INTEGRAL ABUTMENT DETAILS
|N/A
|-
|
|310.05
|WINGWALL DETAILS
|N/A
|-
|
|315.01
|REINFORCED CONCRETE PIER DETAILS
|REINFORCED CONCRETE PIER DETAILS
|04/01/2021
|2022
|-
|-
|
|320.01
|320.01
|N/A
|SLOPE PROTECTION DETAILS
|SLOPE PROTECTION DETAILS
|N/A
|N/A
|-
|-
|
| rowspan="17" |SUPERSTRUCTURE
|
|[[Media:Detail 325.01.pdf|325.01]]
|
|[[Media:Detail 325.01.dgn|DGN]]
|
|-
|Superstructure
|325.01
|CONCRETE DECK DETAILS
|CONCRETE DECK DETAILS
|04/01/2021
|2022
 
|-
|-
|
|[[Media:Detail 325.02.pdf|325.02]]
|325.02
|[[Media:Detail 325.02.dgn|DGN]]
|BRIDGE RAILING DETAILS
|BRIDGE RAILING DETAILS
|04/01/2021
|2022
|-
|-
|
|[[Media:Detail 325.03.pdf|325.03]]
|325.03
|[[Media:Detail 325.03.dgn|DGN]]
|APPROACH SLAB DETAIL
|APPROACH SLAB DETAILS
|01/31/2019
|2022
|-
|-
|
|[[Media:Detail 325.04.pdf|325.04]]
|325.04
|[[Media:Detail 325.04.dgn|DGN]]
|MOMENT SLAB DETAIL
|MOMENT SLAB DETAILS
|04/01/2021
|2022
|-
|-
|
|[[Media:Detail 325.05.pdf|325.05]]
|325.05
|[[Media:Detail 325.05.dgn|DGN]]
|SLEEPER SLAB DETAILS
|SLEEPER SLAB DETAILS
|01/31/2019
|2022
|-
|[[Media:Detail 330.01.pdf|330.01]]
|[[Media:Detail 330.01.dgn|DGN]]
|PRESTRESSED CONCRETE BEAM FRAMING PLAN AND CAMBER DETAILS
|2022
|-
|[[Media:Detail 330.02.pdf|330.02]]
|[[Media:Detail 330.02.dgn|DGN]]
|PRESTRESSED CONCRETE BOX BEAM BRIDGE DETAILS
|2022
|-
|[[Media:Detail 330.03.pdf|330.03]]
|[[Media:Detail 330.03.dgn|DGN]]
|PRESTRESSED CONCRETE NEXT BEAM BRIDGE DETAILS
|2022
|-
|[[Media:Detail 330.04.pdf|330.04]]
|[[Media:Detail 330.04.dgn|DGN]]
|PRESTRESSED CONCRETE PCEF BEAM BRIDGE DETAILS
|2022
|-
|[[Media:Detail 335.01.pdf|335.01]]
|[[Media:Detail 335.01.dgn|DGN]]
|STEEL BEAM BRIDGE DETAILS
|2022
|-
|-
|
|[[Media:Detail 335.02.pdf|335.02]]
|
|[[Media:Detail 335.02.dgn|DGN]]
|
|STEEL BEAM FRAMING PLAN DETAILS
|
|2022
|-
|-
|CULVERTS
|[[Media:Detail 335.03.pdf|335.03]]
|350.01
|[[Media:Detail 335.03.dgn|DGN]]
| PIPE CULVERT DETAILS
|STEEL BEAM CAMBER DETAILS
|10/01/2017
|2022
|-
|-
|
|[[Media:Detail 340.01.pdf|340.01]]
|355.01
|[[Media:Detail 340.01.dgn|DGN]]
|PRECAST CONCRETE BOX CULVERT DETAILS
|STRIP SEAL EXPANSION JOINT DETAILS  
|04/01/2021
|04/01/2021
|-
|-
|
|340.02
|360.01
|N/A
|PRECAST CONCRETE RIGID FRAME DETAILS
|FINGER JOINT EXPANSION JOINT DETAILS
|N/A
|-
|340.03
|N/A
|COMPRESSION SEAL DETAILS
|N/A
|-
|[[Media:Detail 345.01.pdf|345.01]]
|[[Media:Detail 345.01.dgn|DGN]]
|ELASTOMERIC BEARING DETAILS
|2022
|-
|[[Media:Detail 345.02.pdf|345.02]]
|[[Media:Detail 345.02.dgn|DGN]]
|POT BEARING DETAILS
|04/01/2021
|04/01/2021
|-
|-
|
|rowspan="3" |CULVERTS
|
|[[Media:Detail 350.01.pdf|350.01]]
|
|[[Media:Detail 350.01.dgn|DGN]]
|
|PIPE CULVERT DETAILS
|2022
|-
|-
|MISCELLANEOUS
|[[Media:Detail 355.01.pdf|355.01]]
|[[Media:Detail 355.01.dgn|DGN]]
|PRECAST CONCRETE BOX CULVERT DETAILS
|2022
|-
|[[Media:Detail 360.01.pdf|360.01]]
|[[Media:Detail 360.01.dgn|DGN]]
|PRECAST CONCRETE RIGID FRAME DETAILS
|2022
|-
|rowspan="3" |MISCELLANEOUS
|365.01
|365.01
| SIGN STRUCTURES
|N/A
|SIGN STRUCTURES
|N/A
|N/A
|-
|-
|
|370.01
|370.01
|N/A
|SOUND BARRIERS
|SOUND BARRIERS
|N/A
|N/A
|-
|-
|
|375.01
|375.01
|N/A
|BRIDGE LIGHTING DETAILS
|BRIDGE LIGHTING DETAILS
|N/A
|N/A
|}
|}
DISCLAIMER:
ALL TYPICAL BRIDGE DESIGN DETAILS SHOWN IN SECTION 300 OF THE BRIDGE DESIGN MANUAL ARE NOT INTENDED TO ACT AS STANDARD CONSTRUCTION DETAILS, AND THEREFORE MUST BE SHOWN ON BRIDGE PLANS IN THE CONTRACT DOCUMENTS. IN ADDITION, BRIDGE PLANS SHOULD NOT REFER TO SECTION 300 OF THE BRIDGE DESIGN MANUAL


NOTE:
NOTE:
THE DETAILS ON THIS SHEET HAVING 'N/A' UNDER ITS DATE ARE NOT YET AVAILABLE AND WILL BE INCLUDED IN FUTURE BRIDGE DESIGN MANUAL REVISIONS.
THE DETAILS ON THIS SHEET HAVING 'N/A' UNDER ITS DATE ARE NOT YET AVAILABLE AND WILL BE INCLUDED IN FUTURE BRIDGE DESIGN MANUAL REVISIONS.


====Detail No. 301.01 - BRIDGE PROJECT NOTES====
<categorytree mode="all">300 - Typical Bridge Design Details</categorytree>
[[Media:Bdm 2021 301 01.pdf|Click here for PDF]]
 
<gallery widths="360" heights="240">
File:Bdm 2021 301 01 1.png
File:Bdm 2021 301 01 2.png
</gallery>
 
====Detail No. 301.02 - REINFORCEMENT BAR FABRICATION DETAIL====
[[Media:Bdm 2021 301 02 PDF.pdf|Click here for PDF]]
 
<gallery widths="360" heights="240">
File:Bdm 2021 301 02.png
File:Bdm 2021 301 02 2.png
</gallery>
 
====Detail No. 301.03 - Concrete Repair Details====
[[Media:Bdm 2021 301 03 PDF.pdf|Click here for PDF]]
 
<gallery widths="360" heights="240">
File:Bdm 2021 301 03.png
</gallery>
 
====Detail No. 301.04 - Excavation and Backfill Pay Limit Details====
[[Media:Bdm 2021 301 04 PDF.pdf|Click here for PDF]]
 
<gallery widths="360" heights="240">
File:Bdm 2021 301 04 PNG.png
File:Bdm 2021 301 04 2 PNG.png
</gallery>
 
==== Detail No. 305.01 - Prestressed-Precast Concrete Pile Details ====
[[Media:Bdm 2021 305 01 PDF.pdf|Click here for PDF]]
 
<gallery widths="360" heights="240">
File:Bdm 2021 305 01 1.png
File:Bdm 2021 305 01 2.png
</gallery>

Revision as of 15:29, 12 December 2022

Typical Bridge Design details shown in Section 300 of the Bridge Design Manual are not intended to act as Standard Construction Details, and therefore must be shown on bridge plans in the contract documents. In addition, bridge plans should not refer to Section 300 of the Bridge Design Manual.

Download all of Section 300 (PDF)

Subsection PDFs can be downloaded by clicking on the Detail No. below.

INDEX OF TYPICAL BRIDGE DESIGN DETAILS

Subject Detail No. DGN Title Issue Date
GENERAL 301.01 DGN BRIDGE PROJECT NOTES 2022
301.02 DGN REINFORCEMENT BAR FABRICATION DETAILS 2022
301.03 DGN CONCRETE REPAIR DETAILS 2022
301.04 DGN EXCAVATION AND BACKFILL PAY LIMIT DETAILS 2022
SUBSTRUCTURE 305.01 DGN PRESTRESSED-PRECAST CONCRETE PILE DETAILS 2022
305.02 DGN CAST-IN-PLACE PILE DETAILS 2022
305.03 DGN STEEL H-PILE DETAILS 2022
305.04 DGN DRILLED SHAFT DETAILS 2022
310.01 DGN CANTILEVER ABUTMENT DETAILS 2022 (new)
310.02 DGN STUB ABUTMENT DETAILS 2022 (new)
315.01 DGN REINFORCED CONCRETE PIER DETAILS 2022
320.01 N/A SLOPE PROTECTION DETAILS N/A
SUPERSTRUCTURE 325.01 DGN CONCRETE DECK DETAILS 2022
325.02 DGN BRIDGE RAILING DETAILS 2022
325.03 DGN APPROACH SLAB DETAILS 2022
325.04 DGN MOMENT SLAB DETAILS 2022
325.05 DGN SLEEPER SLAB DETAILS 2022
330.01 DGN PRESTRESSED CONCRETE BEAM FRAMING PLAN AND CAMBER DETAILS 2022
330.02 DGN PRESTRESSED CONCRETE BOX BEAM BRIDGE DETAILS 2022
330.03 DGN PRESTRESSED CONCRETE NEXT BEAM BRIDGE DETAILS 2022
330.04 DGN PRESTRESSED CONCRETE PCEF BEAM BRIDGE DETAILS 2022
335.01 DGN STEEL BEAM BRIDGE DETAILS 2022
335.02 DGN STEEL BEAM FRAMING PLAN DETAILS 2022
335.03 DGN STEEL BEAM CAMBER DETAILS 2022
340.01 DGN STRIP SEAL EXPANSION JOINT DETAILS 04/01/2021
340.02 N/A FINGER JOINT EXPANSION JOINT DETAILS N/A
340.03 N/A COMPRESSION SEAL DETAILS N/A
345.01 DGN ELASTOMERIC BEARING DETAILS 2022
345.02 DGN POT BEARING DETAILS 04/01/2021
CULVERTS 350.01 DGN PIPE CULVERT DETAILS 2022
355.01 DGN PRECAST CONCRETE BOX CULVERT DETAILS 2022
360.01 DGN PRECAST CONCRETE RIGID FRAME DETAILS 2022
MISCELLANEOUS 365.01 N/A SIGN STRUCTURES N/A
370.01 N/A SOUND BARRIERS N/A
375.01 N/A BRIDGE LIGHTING DETAILS N/A

NOTE: THE DETAILS ON THIS SHEET HAVING 'N/A' UNDER ITS DATE ARE NOT YET AVAILABLE AND WILL BE INCLUDED IN FUTURE BRIDGE DESIGN MANUAL REVISIONS.