Changelog: Difference between revisions
Jump to navigation
Jump to search
(Added an item.) |
(Added an item.) |
||
Line 3: | Line 3: | ||
* [[106 - Final Design Consideration - Superstructure#106.5.2 Bridge Barrier Design Considerations|106.5.2]] - Added guidance on slip-forming barrier. | * [[106 - Final Design Consideration - Superstructure#106.5.2 Bridge Barrier Design Considerations|106.5.2]] - Added guidance on slip-forming barrier. | ||
* [[106 - Final Design Consideration - Superstructure#106.8.7.1.3 Paint Color|106.8.7.1.3]] - Changed paint colors for structural steel. | * [[106 - Final Design Consideration - Superstructure#106.8.7.1.3 Paint Color|106.8.7.1.3]] - Changed paint colors for structural steel. | ||
* [[109_-_Bridge_Preservation_Strategies#109.11.3.3_Underwater_and_Splash-Zone_Repairs|109.11.3.3]] - Added splash zone definition. | |||
== Minor Updates == | == Minor Updates == |
Revision as of 16:55, 8 August 2022
Major Updates
- 106.5.2 - Added guidance on slip-forming barrier.
- 106.8.7.1.3 - Changed paint colors for structural steel.
- 109.11.3.3 - Added splash zone definition.