Changelog: Difference between revisions

From Delaware DOT Bridge Design Manual
Jump to navigation Jump to search
(Added an item.)
(Added several edits made.)
Line 4: Line 4:
* [[106 - Final Design Consideration - Superstructure#106.8.7.1.3 Paint Color|106.8.7.1.3]] - Changed paint colors for structural steel.
* [[106 - Final Design Consideration - Superstructure#106.8.7.1.3 Paint Color|106.8.7.1.3]] - Changed paint colors for structural steel.
* [[109_-_Bridge_Preservation_Strategies#109.11.3.3_Underwater_and_Splash-Zone_Repairs|109.11.3.3]] - Added splash zone definition.
* [[109_-_Bridge_Preservation_Strategies#109.11.3.3_Underwater_and_Splash-Zone_Repairs|109.11.3.3]] - Added splash zone definition.
* [[103_%E2%80%93_Bridge_Geometry_and_Structure_Type_Selection#103.6.2_Abutments_and_Wingwalls|103.6.2]] - Section has been rewritten to include more abutment types and update selection preferences.
* [[106_-_Final_Design_Consideration_-_Superstructure#106.9.7_Tensile_Stresses_at_Service_Limit_State_After_Losses|106.9.7]] - Inserted new section to refer to the new section 205.9.2.3.2b.
* [[107_-_Final_Design_Considerations_-_Substructure#107.4.1_Abutment_Design|107.4.1]] - Rewrite of Semi-integral and Integral abutment sections.
* [[107_-_Final_Design_Considerations_-_Substructure#107.6.1_Mechanically_Stabilized_Earth_Walls|107.6.1]] - Added guardrail clearances from MSE walls.
* [[205_-_Concrete_Structures#205.9.2.3.2b_%E2%80%93_Tensile_Stresses|205.9.2.3.2b]] - Added departmental preferences for tensile stress limits of prestressed concrete beams.


== Minor Updates ==
== Minor Updates ==
* Adjusted TOC for new sections

Revision as of 16:31, 13 September 2022

Major Updates

  • 106.5.2 - Added guidance on slip-forming barrier.
  • 106.8.7.1.3 - Changed paint colors for structural steel.
  • 109.11.3.3 - Added splash zone definition.
  • 103.6.2 - Section has been rewritten to include more abutment types and update selection preferences.
  • 106.9.7 - Inserted new section to refer to the new section 205.9.2.3.2b.
  • 107.4.1 - Rewrite of Semi-integral and Integral abutment sections.
  • 107.6.1 - Added guardrail clearances from MSE walls.
  • 205.9.2.3.2b - Added departmental preferences for tensile stress limits of prestressed concrete beams.

Minor Updates

  • Adjusted TOC for new sections