Changelog: Difference between revisions

From Delaware DOT Bridge Design Manual
Jump to navigation Jump to search
(Added an item.)
(Added an item.)
Line 22: Line 22:
* [[106 - Final Design Consideration - Superstructure#106.8.9.1.3 Cross-Frame Detailing Methods|106.8.9.1.3]] - Updated fit condition guidance for cross-frames.
* [[106 - Final Design Consideration - Superstructure#106.8.9.1.3 Cross-Frame Detailing Methods|106.8.9.1.3]] - Updated fit condition guidance for cross-frames.
* [[106_-_Final_Design_Consideration_-_Superstructure#106.9.7_Tensile_Stresses_at_Service_Limit_State_After_Losses|106.9.7]] - Inserted new section to refer to the new section 205.9.2.3.2b.
* [[106_-_Final_Design_Consideration_-_Superstructure#106.9.7_Tensile_Stresses_at_Service_Limit_State_After_Losses|106.9.7]] - Inserted new section to refer to the new section 205.9.2.3.2b.
* [[106 - Final Design Consideration - Superstructure#106.10.9.1 Sole Plates|106.10.9.1]] - Deleted language redundant with the Standard Specifications and welding code.
* [[107_-_Final_Design_Considerations_-_Substructure#107.3_Foundation_Design|107.3]] - Updated sub-foundation concrete depth to rock.
* [[107_-_Final_Design_Considerations_-_Substructure#107.3_Foundation_Design|107.3]] - Updated sub-foundation concrete depth to rock.
* [[107_-_Final_Design_Considerations_-_Substructure#107.3.2_Spread_Footing_Foundations|107.3.2]] - Added guidance for spread footings partially bearing on rock.
* [[107_-_Final_Design_Considerations_-_Substructure#107.3.2_Spread_Footing_Foundations|107.3.2]] - Added guidance for spread footings partially bearing on rock.

Revision as of 15:43, 20 October 2022

Major Updates

  • 101.4.6 - Added wiki specific manual update information and removed old information.
  • 103.6.2 - Section has been rewritten to include more abutment types and update selection preferences.
  • 103.9 - ABC section rewrite.
  • 104.1.5 - Updated topographic data and survey information.
  • 104.2 - Updated to current SIR.
  • 104.2.4 - Updated hydrologic analysis method selection guidance.
  • 104.2.5 - Added evacuation route criteria.
  • 104.2.6 - Revised confidence interval discussion and guidance.
  • 104.3.4.7 - Updated to most recent publication of HEC-25.
  • 104.4.4 - Clarified general scour analysis guidance for rigid frames and substructure footings.
  • 104.4.5 - Revised scour countermeasure design guidance for rigid frames.
  • 104.4.5.1 - Added guidance for larger riprap alternatives.
  • 104.5.4 - Revised pump diversion guidance.
  • 104.5.2 - Removed outdated riprap sizing figure. Updated bank protection references.
  • 104.8 - Removed outdated reference to PDM.
  • 104.9 - Updated References.
  • 106.5.2 - Added guidance on slip-forming barrier.
  • 106.8.7.1.3 - Changed paint colors for structural steel.
  • 106.8.9.1.2 - Updated wind loading design requirements.
  • 106.8.9.1.3 - Updated fit condition guidance for cross-frames.
  • 106.9.7 - Inserted new section to refer to the new section 205.9.2.3.2b.
  • 106.10.9.1 - Deleted language redundant with the Standard Specifications and welding code.
  • 107.3 - Updated sub-foundation concrete depth to rock.
  • 107.3.2 - Added guidance for spread footings partially bearing on rock.
  • 107.3.5.3 - Adjusted MSEW step heights.
  • 107.4.1 - Rewrite of Semi-integral and Integral abutment sections.
  • 107.6.1 - Added guardrail clearances from MSE walls.
  • 108 - Replaced all of section 108 with reference to the BLRM.
  • 109.11.3.3 - Added splash zone definition.
  • 205.9.2.3.2b - Added departmental preferences for tensile stress limits of prestressed concrete beams.

Minor Updates

  • Adjusted TOC for new sections