'''Section 102 Bridge Design Submission Requirements''' | |||
:102.1 Plan Presentation | |||
::102.1.1 Drafting Standards | |||
::102.1.2 Plan Sheet Sequence | |||
::102.1.3 Bridge Sheet Preparation | |||
:::102.1.3.1 General and Project Notes | |||
:::102.1.3.2 Bridge Plan and Elevation | |||
:::102.1.3.3 Lay-Out Plan | |||
:::102.1.3.4 Other Plans | |||
::102.1.4 Bridge Number | |||
:102.2 Special Provisions Development | |||
:102.3 Quantities and Cost Estimates | |||
:102.4 Construction Schedule | |||
:102.5 Bridge Design Procedures | |||
::102.5.1 Quality Assurance and Quality Control | |||
::102.5.2 Designed-In Value | |||
:::102.5.2.1 Alternatives Analysis | |||
:::102.5.2.2 Life-Cycle Cost Analyses | |||
::102.5.3 Documentation of Design | |||
::102.5.4 Design Exceptions and Design Variances | |||
::102.5.5 Chronology of Submissions | |||
:102.6 Preliminary Design | |||
::102.6.1 Hydrologic and Hydraulic Report | |||
::102.6.2 Scour Evaluation Report | |||
::102.6.3 Foundation Reports | |||
::102.6.4 Conceptual Type, Size, and Location Plans | |||
::102.6.5 Type, Size, and Location Submission | |||
:::102.6.5.1 Type, Size, and Location Submission Requirements | |||
:102.7 Preliminary Construction Plans | |||
:102.8 Semi-Final Construction Plans | |||
:102.9 Final Construction Plans | |||
:102.10 Plans, Specifications, and Estimate | |||
:102.11 Bid-Cycle Requirements | |||
::102.11.1 Addenda | |||
::102.11.2 Bid Opening and Bid Review | |||
:102.12 References |
Revision as of 12:21, 9 December 2021
- 101.1 Purpose
- 101.2 Limitations of the Design Manual
- 101.3 Policy
- 101.4 Applicable Design Specifications and Standards
- 101.4.1 Design Specification Reference Nomenclature
- 101.4.2 Design Specifications
- 101.4.3 AASHTO Interim Specifications and New Editions
- 101.4.4 Deviations from Specifications
- 101.4.5 Order of Precedence
- 101.4.6 Modifications to the Design Manual
- 101.4.7 Additional Reference Manuals and Documents
- 101.5 Terms
- 101.5.1 Bridge Types
- 101.5.2 Roadway Types
- 101.5.2.1 Functional Classification
- 101.5.2.2 National Highway System
- 101.5.3 Project Types
- 101.6 FHWA Stewardship and Oversight Agreement
- 101.7 Computer Software
- 101.8 Feedback
- 101.9 References
Section 102 Bridge Design Submission Requirements
- 102.1 Plan Presentation
- 102.1.1 Drafting Standards
- 102.1.2 Plan Sheet Sequence
- 102.1.3 Bridge Sheet Preparation
- 102.1.3.1 General and Project Notes
- 102.1.3.2 Bridge Plan and Elevation
- 102.1.3.3 Lay-Out Plan
- 102.1.3.4 Other Plans
- 102.1.4 Bridge Number
- 102.2 Special Provisions Development
- 102.3 Quantities and Cost Estimates
- 102.4 Construction Schedule
- 102.5 Bridge Design Procedures
- 102.5.1 Quality Assurance and Quality Control
- 102.5.2 Designed-In Value
- 102.5.2.1 Alternatives Analysis
- 102.5.2.2 Life-Cycle Cost Analyses
- 102.5.3 Documentation of Design
- 102.5.4 Design Exceptions and Design Variances
- 102.5.5 Chronology of Submissions
- 102.6 Preliminary Design
- 102.6.1 Hydrologic and Hydraulic Report
- 102.6.2 Scour Evaluation Report
- 102.6.3 Foundation Reports
- 102.6.4 Conceptual Type, Size, and Location Plans
- 102.6.5 Type, Size, and Location Submission
- 102.6.5.1 Type, Size, and Location Submission Requirements
- 102.7 Preliminary Construction Plans
- 102.8 Semi-Final Construction Plans
- 102.9 Final Construction Plans
- 102.10 Plans, Specifications, and Estimate
- 102.11 Bid-Cycle Requirements
- 102.11.1 Addenda
- 102.11.2 Bid Opening and Bid Review
- 102.12 References