Category:Detail 301.01
Jump to navigation
Jump to search
BRIDGE PROJECT NOTES
Changelog
2024
- Updated Design Specifications note to 2024 BDM and AASHTO LRFD 9th Edition, 2020
2022
- Sheet 1 of 2
- Deleted the 'Shop assemble' sub-note of PN 18.
- Deleted Note 24C because it repeats the General Notes.
- Sheet 2 of 2
- Added the Explanatory Note.
Media in category "Detail 301.01"
The following 2 files are in this category, out of 2 total.
- Detail 301.01.dgn ; 146 KB
- Detail 301.01.pdf 0 × 0; 2.97 MB