Category:Detail 330.02
Jump to navigation
Jump to search
PRESTRESSED CONCRETE BOX BEAM BRIDGE DETAILS
Changelog
2022
- Sheet 1 of 3
- Edited top bars to terminate above bottom slab pour.
- Sheet 3 of 3
- Edited bar dimensions to reflect above change.
Media in category "Detail 330.02"
The following 2 files are in this category, out of 2 total.
- Detail 330.02.dgn ; 609 KB
- Detail 330.02.pdf 0 × 0; 1.37 MB