Detail No. 300.1 - Index of Typical Bridge Design Details
Subject | Detail No. | Title | Issue Date |
---|---|---|---|
GENERAL | 301.01 | BRIDGE PROJECT NOTES | 04/01/2021 |
301.02 | REINFORCEMENT BAR FABRICATION DETAILS | 04/01/2021 | |
301.03 | CONCRETE REPAIR DETAILS | 01/31/2019 | |
301.04 | EXCAVATION AND BACKFILL PAY LIMIT DETAILS | 10/01/2016 | |
Substructure | 305.01 | PRESTRESSED-PRECAST CONCRETE PILE DETAILS | 04/01/2021 |
305.02 | CAST-IN-PLACE PILE DETAILS | 04/01/2021 | |
305.03 | STEEL H-PILE DETAILS | 04/01/2021 | |
305.04 | DRILLED SHAFT DETAILS | 04/01/2021 | |
310.01 | REINFORCED CONCRETE CANTILEVER ABUTMENT DETAILS | N/A | |
310.02 | STUB ABUTMENT DETAILS | N/A | |
310.03 | SEMI-INTEGRAL ABUTMENT DETAIL | N/A | |
310.04 | INTEGRAL ABUTMENT DETAILS | N/A | |
310.05 | WINGWALL DETAILS | N/A | |
315.01 | REINFORCED CONCRETE PIER DETAILS | 04/01/2021 | |
320.01 | SLOPE PROTECTION DETAILS | N/A | |
Superstructure | 325.01 | CONCRETE DECK DETAILS | 04/01/2021 |
325.02 | BRIDGE RAILING DETAILS | 04/01/2021 | |
325.03 | APPROACH SLAB DETAIL | 01/31/2019 | |
325.04 | MOMENT SLAB DETAIL | 04/01/2021 | |
325.05 | SLEEPER SLAB DETAILS | 01/31/2019 | |
CULVERTS | 350.01 | PIPE CULVERT DETAILS | 10/01/2017 |
355.01 | PRECAST CONCRETE BOX CULVERT DETAILS | 04/01/2021 | |
360.01 | PRECAST CONCRETE RIGID FRAME DETAILS | 04/01/2021 | |
MISCELLANEOUS | 365.01 | SIGN STRUCTURES | N/A |
370.01 | SOUND BARRIERS | N/A | |
375.01 | BRIDGE LIGHTING DETAILS | N/A |