(Created page with "{| class="wikitable" |+ !Subject !Detail No. !Title !Issue Date |- |GENERAL |301.01 |BRIDGE PROJECT NOTES |04/01/2021 |- | |301.02 |REINFORCEMENT BAR FABRICATION DETAILS |04/0...")
 
m (Added category tree)
(98 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{GlobalNav}}
Typical Bridge Design details shown in Section 300 of the ''Bridge Design Manual'' are not intended to act as ''Standard Construction Details'', and therefore must be shown on bridge plans in the contract documents. In addition, bridge plans should not refer to Section 300 of the ''Bridge Design Manual''.
[[Media:Section 300.pdf|'''<big>Download all of Section 300 (PDF)</big>''']]
Subsection PDFs can be downloaded by clicking on the Detail No. below.
===INDEX OF TYPICAL BRIDGE DESIGN DETAILS===
{| class="wikitable"
{| class="wikitable"
|+
! Subject
!Subject
!Detail No.
!Detail No.
!DGN
!Title
!Title
!Issue Date
!Issue Date  
|-
|-
|GENERAL
| rowspan="4" |GENERAL
|301.01
|[[Media:Detail 301.01.pdf|301.01]]
|BRIDGE PROJECT NOTES
|[[Media:Detail 301.01.dgn|DGN]]
|04/01/2021
|BRIDGE PROJECT NOTES  
|2022
|-
|-
|
|[[Media:Detail 301.02.pdf|301.02]]
|301.02
|[[Media:Detail 301.02.dgn|DGN]]
|REINFORCEMENT BAR FABRICATION DETAILS
|REINFORCEMENT BAR FABRICATION DETAILS
|04/01/2021
|2022
|-
|-
|
|[[Media:Detail 301.03.pdf|301.03]]
|301.03
|[[Media:Detail 301.03.dgn|DGN]]
|CONCRETE REPAIR DETAILS
|CONCRETE REPAIR DETAILS
|01/31/2019
|2022
|-
|-
|
|[[Media:Detail 301.04.pdf|301.04]]
|301.04
|[[Media:Detail 301.04.dgn|DGN]]
|EXCAVATION AND BACKFILL PAY LIMIT DETAILS
|EXCAVATION AND BACKFILL PAY LIMIT DETAILS
|10/01/2016
|2022
|-
| rowspan="8" | SUBSTRUCTURE
|[[Media:Detail 305.01.pdf|305.01]]
|[[Media:Detail 305.01.dgn|DGN]]
|PRESTRESSED-PRECAST CONCRETE PILE DETAILS
|2022
|-
|[[Media:Detail 305.02.pdf|305.02]]
|[[Media:Detail 305.02.dgn|DGN]]
|CAST-IN-PLACE PILE DETAILS
|2022
|-
|[[Media:Detail 305.03.pdf|305.03]]
|[[Media:Detail 305.03.dgn|DGN]]
|STEEL H-PILE DETAILS
|2022
|-
|[[Media:Detail 305.04.pdf|305.04]]
|[[Media:Detail 305.04.dgn|DGN]]
|DRILLED SHAFT DETAILS
|2022
|-
|[[Media:Detail 310.01.pdf|310.01]]
|[[Media:Detail 310.01.dgn|DGN]]
|CANTILEVER ABUTMENT DETAILS
|2022 (new)
|-
|[[Media:Detail 310.02.pdf|310.02]]
|[[Media:Detail 310.02.dgn|DGN]]
|STUB ABUTMENT DETAILS
|2022 (new)
|-
|[[Media:Detail 315.01.pdf|315.01]]
|[[Media:Detail 315.01.dgn|DGN]]
|REINFORCED CONCRETE PIER DETAILS
|2022
|-
|320.01
|N/A
|SLOPE PROTECTION DETAILS
|N/A
|-
| rowspan="17" |SUPERSTRUCTURE
|[[Media:Detail 325.01.pdf|325.01]]
|[[Media:Detail 325.01.dgn|DGN]]
|CONCRETE DECK DETAILS
|2022
|-
|[[Media:Detail 325.02.pdf|325.02]]
|[[Media:Detail 325.02.dgn|DGN]]
|BRIDGE RAILING DETAILS
|2022
|-
|[[Media:Detail 325.03.pdf|325.03]]
|[[Media:Detail 325.03.dgn|DGN]]
|APPROACH SLAB DETAILS
|2022
|-
|[[Media:Detail 325.04.pdf|325.04]]
|[[Media:Detail 325.04.dgn|DGN]]
|MOMENT SLAB DETAILS
|2022
|-
|[[Media:Detail 325.05.pdf|325.05]]
|[[Media:Detail 325.05.dgn|DGN]]
|SLEEPER SLAB DETAILS
|2022
|-
|[[Media:Detail 330.01.pdf|330.01]]
|[[Media:Detail 330.01.dgn|DGN]]
|PRESTRESSED CONCRETE BEAM FRAMING PLAN AND CAMBER DETAILS
|2022
|-
|-
|
|[[Media:Detail 330.02.pdf|330.02]]
|
|[[Media:Detail 330.02.dgn|DGN]]
|
|PRESTRESSED CONCRETE BOX BEAM BRIDGE DETAILS
|
|2022
|-
|-
|Substructure
|[[Media:Detail 330.03.pdf|330.03]]
|305.01
|[[Media:Detail 330.03.dgn|DGN]]
|PRESTRESSED-PRECAST CONCRETE PILE DETAILS
|PRESTRESSED CONCRETE NEXT BEAM BRIDGE DETAILS
|2022
|-
|[[Media:Detail 330.04.pdf|330.04]]
|[[Media:Detail 330.04.dgn|DGN]]
|PRESTRESSED CONCRETE PCEF BEAM BRIDGE DETAILS
|2022
|-
|[[Media:Detail 335.01.pdf|335.01]]
|[[Media:Detail 335.01.dgn|DGN]]
|STEEL BEAM BRIDGE DETAILS
|2022
|-
|[[Media:Detail 335.02.pdf|335.02]]
|[[Media:Detail 335.02.dgn|DGN]]
|STEEL BEAM FRAMING PLAN DETAILS
|2022
|-
|[[Media:Detail 335.03.pdf|335.03]]
|[[Media:Detail 335.03.dgn|DGN]]
|STEEL BEAM CAMBER DETAILS
|2022
|-
|[[Media:Detail 340.01.pdf|340.01]]
|[[Media:Detail 340.01.dgn|DGN]]
|STRIP SEAL EXPANSION JOINT DETAILS  
|04/01/2021
|04/01/2021
|-
|-
|
|340.02
|305.02
|N/A
|CAST-IN-PLACE PILE DETAILS
|FINGER JOINT EXPANSION JOINT DETAILS
|N/A
|-
|340.03
|N/A
|COMPRESSION SEAL DETAILS
|N/A
|-
|[[Media:Detail 345.01.pdf|345.01]]
|[[Media:Detail 345.01.dgn|DGN]]
|ELASTOMERIC BEARING DETAILS
|2022
|-
|[[Media:Detail 345.02.pdf|345.02]]
|[[Media:Detail 345.02.dgn|DGN]]
|POT BEARING DETAILS
|04/01/2021
|04/01/2021
|-
|-
|
|rowspan="3" |CULVERTS
|305.03
|[[Media:Detail 350.01.pdf|350.01]]
|STEEL H-PILE DETAILS
|[[Media:Detail 350.01.dgn|DGN]]
|04/01/2021
|PIPE CULVERT DETAILS
|2022
|-
|[[Media:Detail 355.01.pdf|355.01]]
|[[Media:Detail 355.01.dgn|DGN]]
|PRECAST CONCRETE BOX CULVERT DETAILS
|2022
|-
|[[Media:Detail 360.01.pdf|360.01]]
|[[Media:Detail 360.01.dgn|DGN]]
|PRECAST CONCRETE RIGID FRAME DETAILS
|2022
|-
|rowspan="3" |MISCELLANEOUS
|365.01
|N/A
|SIGN STRUCTURES
|N/A
|-
|370.01
|N/A
|SOUND BARRIERS
|N/A
|-
|-
|
|375.01
|305.04
|N/A
|DRILLED SHAFT DETAILS
|BRIDGE LIGHTING DETAILS
|04/01/2021
|N/A
|}
|}
NOTE:
THE DETAILS ON THIS SHEET HAVING 'N/A' UNDER ITS DATE ARE NOT YET AVAILABLE AND WILL BE INCLUDED IN FUTURE BRIDGE DESIGN MANUAL REVISIONS.
<categorytree mode="all">300 - Typical Bridge Design Details</categorytree>

Revision as of 15:29, 12 December 2022

Typical Bridge Design details shown in Section 300 of the Bridge Design Manual are not intended to act as Standard Construction Details, and therefore must be shown on bridge plans in the contract documents. In addition, bridge plans should not refer to Section 300 of the Bridge Design Manual.

Download all of Section 300 (PDF)

Subsection PDFs can be downloaded by clicking on the Detail No. below.

INDEX OF TYPICAL BRIDGE DESIGN DETAILS

Subject Detail No. DGN Title Issue Date
GENERAL 301.01 DGN BRIDGE PROJECT NOTES 2022
301.02 DGN REINFORCEMENT BAR FABRICATION DETAILS 2022
301.03 DGN CONCRETE REPAIR DETAILS 2022
301.04 DGN EXCAVATION AND BACKFILL PAY LIMIT DETAILS 2022
SUBSTRUCTURE 305.01 DGN PRESTRESSED-PRECAST CONCRETE PILE DETAILS 2022
305.02 DGN CAST-IN-PLACE PILE DETAILS 2022
305.03 DGN STEEL H-PILE DETAILS 2022
305.04 DGN DRILLED SHAFT DETAILS 2022
310.01 DGN CANTILEVER ABUTMENT DETAILS 2022 (new)
310.02 DGN STUB ABUTMENT DETAILS 2022 (new)
315.01 DGN REINFORCED CONCRETE PIER DETAILS 2022
320.01 N/A SLOPE PROTECTION DETAILS N/A
SUPERSTRUCTURE 325.01 DGN CONCRETE DECK DETAILS 2022
325.02 DGN BRIDGE RAILING DETAILS 2022
325.03 DGN APPROACH SLAB DETAILS 2022
325.04 DGN MOMENT SLAB DETAILS 2022
325.05 DGN SLEEPER SLAB DETAILS 2022
330.01 DGN PRESTRESSED CONCRETE BEAM FRAMING PLAN AND CAMBER DETAILS 2022
330.02 DGN PRESTRESSED CONCRETE BOX BEAM BRIDGE DETAILS 2022
330.03 DGN PRESTRESSED CONCRETE NEXT BEAM BRIDGE DETAILS 2022
330.04 DGN PRESTRESSED CONCRETE PCEF BEAM BRIDGE DETAILS 2022
335.01 DGN STEEL BEAM BRIDGE DETAILS 2022
335.02 DGN STEEL BEAM FRAMING PLAN DETAILS 2022
335.03 DGN STEEL BEAM CAMBER DETAILS 2022
340.01 DGN STRIP SEAL EXPANSION JOINT DETAILS 04/01/2021
340.02 N/A FINGER JOINT EXPANSION JOINT DETAILS N/A
340.03 N/A COMPRESSION SEAL DETAILS N/A
345.01 DGN ELASTOMERIC BEARING DETAILS 2022
345.02 DGN POT BEARING DETAILS 04/01/2021
CULVERTS 350.01 DGN PIPE CULVERT DETAILS 2022
355.01 DGN PRECAST CONCRETE BOX CULVERT DETAILS 2022
360.01 DGN PRECAST CONCRETE RIGID FRAME DETAILS 2022
MISCELLANEOUS 365.01 N/A SIGN STRUCTURES N/A
370.01 N/A SOUND BARRIERS N/A
375.01 N/A BRIDGE LIGHTING DETAILS N/A

NOTE: THE DETAILS ON THIS SHEET HAVING 'N/A' UNDER ITS DATE ARE NOT YET AVAILABLE AND WILL BE INCLUDED IN FUTURE BRIDGE DESIGN MANUAL REVISIONS.